CRTC to review rules for access to in-building telephone and cable wires
Broadcast | August 31, 2000
After years of squabbling between telcos, cablecos, new competitors and building owners, the CRTC has finally initiated a proceeding to establish rules for in-building access. Released August 25, Telecom PN 2000-124 will examine the possible fees, charges and other terms and conditions associated with access to multi-units dwellings (MUDs). The proceeding will look at the rules for facilities used by broadcast distributors, incumbent local exchange carriers and competitive local exchange carriers (CLECs).
This content is available to wirereport.ca subscribers
Already a subscriber? Sign in here
Unlock all the Canadian telecom, broadcasting and digital media news you need.
Take a free trial or subscribe to The Wire Report now.
FREE TRIAL
Two weeks of free access to thewirereport.ca and our exclusive newsletters.
SUBSCRIBE
Unlimited access to thewirereport.ca and our exlusive newsletters.